LANDSCAPE INTEGRATION STUDY FOR THE DUPLICATION OF THE METRO LINE FROM ALBORAIA TO RAFELBUNYOL
The work carried out consisted in the elaboration of a Landscape Integration Study to analyze the landscape and visual impact of the construction project for the duplication of Metrovalencia Line 3. On the stretch between Rafelbunyol and Alboraya. The works are concentrated on three sections: Rafelbunyol-Massamagrell, Museros-Albalat dels Sorells and Almàssera-Alboraya. In compliance with the […]
ACOUSTIC STUDY OF THE N-323 MORELLA
Acoustic study of the service contract for the “Environmental processing and updating of the layout and construction project: conditioning and rearrangement of accesses. N-232. Section: Masía de la Torreta-Morella South”. Calculation models approved and recommended by Directive 49/2002/EC of the European Parliament on the assessment and management of environmental noise have been used for the […]
IMPACT STUDY ON THE NATURA 2000 NETWORK FOR THE CONSTRUCTION OF THE NEW WWTP OF OLIVA NORTE
The work carried out consists of the preparation of the document “Evaluation of the impact of the project on the Natura 2000 Network”, required by the Directives 92/43EEC on Habitats and 2009/147/EC on Birds, transposed by the Law 42/2007 on Natural Heritage and Biodiversity, and duly integrating it into the ENVIRONMENTAL DOCUMENT OF THE SIMPLIFIED […]
ECONOMIC EVALUATION OF THE COST-EFFECTIVENESS OF THE FORESTRY ACTIONS OF THE PILOT FARMS OF THE LIFE+BOSCOS PROJECT
The LIFE+BOSCOS Project focuses on forest ecosystem governance demonstration actions for proper adaptation to climate change. Nine actions were implemented with multifunctional objectives: Maintain the agroforestry mosaic (currently in the process of agricultural abandonment). Increase the specific and structural biodiversity of forest ecosystems. Increase the vigour of forest masses to cope with the climate change […]