Menú

VALENCIA

LANDSCAPE INTEGRATION STUDY FOR THE DUPLICATION OF THE METRO LINE FROM ALBORAIA TO RAFELBUNYOL

Working field

Environmental Studies

Client

INECO / GESMAN INGENIERÍA DE GESTIÓN S.L.

Ending Year

2021

Budget

--

The work carried out consisted in the elaboration of a Landscape Integration Study to analyze the landscape and visual impact of the construction project for the duplication of Metrovalencia Line 3. On the stretch between Rafelbunyol and Alboraya. The works are concentrated on three sections: Rafelbunyol-Massamagrell, Museros-Albalat dels Sorells and Almàssera-Alboraya.

In compliance with the requirements of Law 5/2014, of 25 July, of the Generalitat, of Spatial Planning, Urbanism and Landscape of the Valencian Community.

Type of services provided:

  • Drafting of a Landscape Integration Study that develops the following contents:
    • Description and definition of the scope of the action.
    • Analysis of alternatives and justification of the solution adopted.
    • Characterization of the landscape and determination of its valuation and fragility.
    • Relationship with other plans, studies, projects and implementing regulations.
    • Assessment of landscape integration.
    • Evaluation of visual integration.
    • Implementation programme.
  • Design of landscape integration alternatives.
  • Mapping of integration measures.

FEATURED

PROJECTS