Budget

--

This work consists of the realization of 8 preliminary projects of contribution areas and ecoparks. It also includes the study of the access(s) according to the circumstances of both the contribution area and the road (slope, visibility, traffic, speed, etc…).

The documentation to be prepared corresponds to the following scheme:

  • A report, in which the solution is presented, the different facilities, the construction procedure and the evaluation of the works are described, as well as the mandatory annexes: Safety and Health Study. Quality Control Plan. Waste management.
  • Plans.
  • Specifications.
  • Budget.

The municipalities are:

  • Sant Joan d’Alacant
  • Cocentaina
  • Agost
  • L’Orxa
  • Alfafara
  • Planes
  • Tollos
  • Alcoleja